
October 14, 2026
From order to keys: how buying a Mytikas cabin works
Six steps, and 45 to 55 days from order and deposit to delivery. How a Mytikas cabin goes from your screen to your site.
Read more
October 14, 2026
Six steps, and 45 to 55 days from order and deposit to delivery. How a Mytikas cabin goes from your screen to your site.
Read more
October 12, 2026
Lumber warps, shrinks and moves. Light-gauge steel does not, so the walls of a Mytikas cabin stay where they were built.
Read more
October 10, 2026
Most park models ride on a generic trailer frame. A Mytikas cabin sits on a custom steel chassis that is permanently part of its structure.
Read more
June 24, 2026
How steel framing and in-house craftsmanship make Mytikas housing ready for disaster recovery.
Read more
May 24, 2026
A look inside our light-gauge steel framing process, from Howick roll-forming to assembly in Florence.
Read more
April 27, 2026
How recycled steel, precision manufacturing and long-lived materials add up to lower-impact housing.
Read more